Projects

PROJECT: Toyota Office Campus – Texas
CONTRACT TYPE: Negotiated (12.9 Million)
SCOPE: Project included new office building and manufacturing plant on Toyota Tundra campus.

    • Submitted change orders and pay application to owner.
    • Detailed estimating, buy-out, wrote and issued contracts.
    • Reviewed design and establish design document release dates.

 

PROJECT: Alltel Stadium Renovation Project – Florida
CONTRACT TYPE: Negotiated Bid (40 Million)
SCOPE: Renovation of the NFL’S Jacksonville Jaguars Alltel Stadium south end zone for Super bowl XXXIX; featuring the new Bud Zone and Terrace Club Suite which included terrazzo flooring, radius columns, the hull of a speed boat, wind sails, and other high end features.

    • Entirely responsible for the design and construction of the south end zone field tunnel (drilled piers).
    • Buyout of decorative hand and protective glass hand rails.
    • Quality assurance of rebar and waterproofing requirements.
    • Rebar shop drawings review.
    • Ordering and tracking all structural steel for the entire project.
    • Project closeout that included tracking of +3,000 punchlist items.

 

PROJECT: General Electric Learning Center – Ohio
CONTRACT TYPE: Negotiated Bid (17 Million)
SCOPE: Project included new tilt-up concrete for office building and the renovation of an existing warehouse to install a 200k sf. cooler for Pepsi / Tropicana. This project also included an ammonia refrigeration system, built up flooring systems and CMU machine room with blowout panels.

    • Reviewed seismic calculations and design drawings.
    • Managed design team.
    • Detailed estimating.
    • Budget set up and scope buyout.
    • Wrote contracts, major purchase orders.
    • Approved subcontractor pay applications and miscellaneous invoices.

 

PROJECT: Alcatel Office Building – New York
CONTRACT TYPE: Hard Bid (14 Million)
SCOPE: Tilt up concrete office structure 25,000 SF

    • Tracking delivery dates for all major equipment.
    • Created templates for weather delays and lost time accidents and safety infractions.
    • Project close out (punch list items and as built drawings and final waiver).
    • Owner’s training / Operation and Maintenance manuals submission.

 

PROJECT: NYC High School – New York
SCOPE: Project Engineer New York City School Construction Authority

    • Produce construction documents.
    • Assisted engineers with AutoCAD technical problems.
    • As field Engineer, conducted take offs, attended meetings, composed meeting minutes and processed submittals.

 